Michael
and Stephanie Brice, Joan Hartvigsen, Valerie Galan(Murfreesboro), Jackie and
Sidney Sexton attended.
Monday, October 8, 2012
Thursday, October 4, 2012
Six volunteers met at the parking lot at SSNA at 9:00AM
to work in the park. Joan Hartsvigsen
and Pat Bigbee left and cut brush from the corridor of Machine Falls Trail from
the entrance counter clock wise to Adams Fall Trail junction.
Tom Hartsvigsen, Rob Moreland, Bryan Webb and Wally
Bigbee went to
build some stairs on the Machine Falls Trail steep slope
going down
into the gorge. Wally opened the gate and everyone went
with the jeep and a loaded trailer on the Tower Trail to Machine Falls Trail and
on just beyond the Connector Trail junction.
We unloaded the equipment and part of the materials and
carried them
75 yards down to the first step site. The largest items were the rented electric
generator and the hammer drill. After
applying "Liquid Nails to joints, a stringer was connected to 7 x 8 x 24
inch blocks with nails and deck screws.
The other stringer was applied.
Rob was our generator operator. Holes had been
pre-drilled in the tread blocks and holes were drilled in the rock to match them.
It took about 5 minutes to drill each 5" deep 1/2" hole. Tom mixed
epoxy glue that he placed in the holes and on the rods. The blocks were put in place and the rods
inserted. A hole was drilled in the
upper part of left side stringer and into the side rock. A rod was coated with epoxy and hammered
through the stringer and into the rock. The stair was steady and solid with no
motion on testing. The right side
stringer was left long so that newel posts and a hand rail can be added
later. We disconnected the trailer and
got the jeep turned around, loaded up and left feeling good about our morning's
work.
Wally Bigbee, work day coordinator